ETC Engineering Group Office Complex – Baghdad, Iraq

Client: ETC Company

Contractor: Paydar Komeh Pars Co. (Hemiball)

Order Date: 2024

The ETC Engineering Group Office Complex consists of three Hemiball 4V geodesic structures, covering a total of 64 m². Each structure is built with hot-dip galvanized steel frames, XPS sandwich panels, aluminum finishing, and aliphatic paint for enhanced durability and thermal resistance. One of the main challenges of this project was the extreme climate in Baghdad, where summer temperatures can reach up to 52°C. Despite these harsh conditions, the project was successfully completed and delivered to the client.